The new heart of Italian Exhibition Group’s (IEG) Expo Centre in Vicenza is starting to take shape. Six months after laying the foundation stone, the construction site is now displaying the first outer walls of the 22,000-square-metre two-level building, designed by pre-eminent architect Volkwin Marg from Hamburg-based Studio GMP. The timeline set by IEG for the development work at its Vicenza premises is progressing perfectly to schedule in accordance with the announced timetable and is preparing to enter a new phase: by the end of June, assembly work on the impressive prefabricated body, which will be positioned inside the outer walls currently under construction and already partly visible, will begin.